Contract details (awarded)
Shirley Skatepark Works
Southampton City Council
Key facts
| Buyer | Southampton City Council |
|---|---|
| Notice type | Contract details (awarded) (UK7) |
| Value | Not stated |
| Deadline | Not stated |
| Clarification deadline | Not stated |
| Procedure | Below threshold - without competition |
| Category | Not stated |
| Region | South East |
| Contract period | 6 Aug 2026 to 5 Aug 2027 |
| Suitable for SMEs | Not stated |
| Legal regime | Procurement Act 2023 |
| Published | 6 Aug 2026 |
Description (as published)
The proposed works comprise the refurbishment and enhancement of the existing Shirley Ponds Skatepark through extensive groundworks, site regrading and reinforced concrete construction. A key feature of the scheme is the retention of the existing skate ramps and trick features, which will remain in situ and be utilised as permanent formwork for the new concrete skatepark. Rather than demolishing and removing the existing structures, reinforced concrete will be poured over and around them, encapsulating the current features and incorporating them into the structural fabric of the new facility. This innovative approach removes the need for demolition and disposal of the existing equipment, reducing both construction costs and environmental impact whilst retaining much of the existing skatepark footprint. The works also include excavation and levelling of the site, installation of geotextile membrane, imported fill and Type 1 sub-base materials, reinforced concrete slabs, edge details and associated concrete riding surfaces. Together, these works will deliver a durable, modern concrete skatepark that maximises the value of existing assets while providing a significantly improved facility for users.
Who won
Awarded value: Not stated
CPV codes
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.