Open tenderSuitable for SMEs
Naval Architecture Services
Northern Lighthouse Board
Deadline (your time) ·
Key facts
| Buyer | Northern Lighthouse Board |
|---|---|
| Notice type | Open tender (UK4) |
| Value | £1.9m |
| Deadline | 15 Jan 2027, 14:00 |
| Clarification deadline | 15 Jan 2027, 14:00 |
| Procedure | Competitive flexible procedure |
| Category | Services |
| Region | UK-wide |
| Contract period | 4 Mar 2027 to 3 Mar 2032 |
| Suitable for SMEs | Yes |
| Legal regime | Procurement Act 2023 |
| Published | 23 Nov 2026 |
Description (as published)
The appointed Naval Architect shall develop a concept technical specification to a level of maturity that then enables prospective shipbuilders to submit fixed-price
tenders for the detailed design and construction of the vessel as part of a separate future procurement process. The vessel design shall seek to:
• Maximise manoeuvrability, seakeeping performance, crew comfort and safety.
• Minimise helideck motion during low-speed operations.
• Minimise operational throughout the vessel's lifecycle.
• Maximise reliability of machinery, equipment and operational systems.
• Minimise airborne emissions, discharges and other environmental impacts.
• Have a desired design life of 25 years of operational use by NLB
A key objective of the project is to produce a vessel design capable of accommodating alternative fuel technologies while optimising overall energy efficiency. The design shall seek to minimise fuel consumption, carbon dioxide (CO2) emissions and other environmental emissions and must consider these objectives throughout the design process. Provision shall also be made for the collection, treatment and disposal of all operational waste streams, including bilge water, sludge, sewage and garbage. The technical specification and associated plans shall be developed in close collaboration with NLB personnel. The successful supplier will therefore be expected to join the NLB vessel replacement integrated project team and coordinate the technical workstreams throughout all stages of design development. The successful supplier will therefore be integrated as part of the NLB team for the future procurement process for the design and construction of the vessel. Tenderers are reminded of NLB’s obligations under the Act applicable to a covered procurement to take all reasonable steps to identify and keep under review conflicts of interest and potential conflicts of interest and to ensure that a conflict does not put a supplier at an unfair advantage in relation to a covered procurement. This may include requiring a supplier to take reasonable steps to ensure it is not put at an unfair advantage. As the technical specification, plans and associated Schedules will form part of the shipyard tender documentation, their content must comply with the requirements of the UK Procurement Act 2023, including but not limited to the rules on technical specifications, and any other applicable public sector procurement legislation in force at the time of issue, including relevant Procurement Policy Notes (PPNs). The shipyard ultimately awarded the detailed design and build contract shall be responsible for the complete and fully developed vessel design in all respects.
The purpose of this initial stage of the project is therefore to develop a robust preliminary design that satisfies NLB's operational requirements and provides confidence that the proposed solution is practical, achievable and capable of successful delivery at an affordable cost.
CPV codes
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.