Contract awardSuitable for SMEs
MetroWest Phase 1B Highways and Bridges Design and Construction Contract - Award of Stage 2 Package 2 Bridges Contract 3 (Royal Portbury Dock Road)
North Somerset Council
Deadline (your time) ·
Key facts
| Buyer | North Somerset Council |
|---|---|
| Notice type | Contract award |
| Value | £1.2m |
| Deadline | 13 Dec 2023, 13:00 |
| Clarification deadline | Not stated |
| Procedure | Open procedure |
| Category | Works |
| Region | South West |
| Contract period | 15 Jul 2026 to 14 Jul 2027 |
| Suitable for SMEs | Yes |
| Legal regime | Not stated |
| Published | 28 Aug 2026 |
Description (as published)
North Somerset Council procured a contractor to deliver the design and construction works to upgrade highways and bridges as part of the MetroWest Phase 1B project.
The overall objective of MetroWest Phase 1B is to re-open the Portishead rail line and provide an hourly service between Portishead and Bristol Temple Meads, with new stations at Portishead and Pill. The Project will connect 50,000 residents to the rail network and forms part of a wider MetroWest programme to deliver strategic enhancements to the local rail network.
The highway and bridge works comprise of two works packages. Package 1 is the highways scope which includes detailed design (stage 1) and construction (stage 2). Package 2 is the bridges scope which includes stage 2 construction only (covered by 3 separate contracts).
This notice relates to the award of the Stage 2 Package 2 Bridges construction contract 3 of 3 (Royal Portbury Dock Road)
Who won
Awarded value: £1.2m · awarded 14 Jul 2026
CPV codes
Source: Contracts Finder. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.