Contract details (awarded)
Langton Mine Water Treatment Scheme (MWTS) Design and Build
Mining Remediation Authority
Key facts
| Buyer | Mining Remediation Authority |
|---|---|
| Notice type | Contract details (awarded) |
| Value | Not stated |
| Deadline | Not stated |
| Clarification deadline | Not stated |
| Procedure | Award procedure without prior publication of a call for competition |
| Category | Works |
| Region | East Midlands |
| Contract period | Not stated |
| Suitable for SMEs | Not stated |
| Legal regime | Public Contracts Regulations 2015 |
| Published | 31 Jul 2026 |
Description (as published)
pumped passive Mine Water Treatment Scheme (MWTS) at the site in Langton to protect and enhance the environment through the control and management of coal mine water and to mitigate the deterioration of water quality and ground water resources.
We have completed a compliant Early Contractor Involvement (2 Stage) procurement by conducting mini competition through the Pagabo Civils and Infrastructure Framework Lot 2 Midlands - Water Supply & Waste Water in accordance with Public Contract Regulations 2015 (PCR15).
2-stage procurement approach via the X22 - Early Contractor Involvement (ECI) mechanism through a NEC4 Engineering and Construction Contract. Stage 1 is the pre-construction ECI phase, with development of the scope, detailed design and agreement on price for construction.
Who won
Awarded value: Not stated
CPV codes
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.