Early market engagement
HWTWRP Continued ME4
Southern Water Services Limited
Key facts
| Buyer | Southern Water Services Limited |
|---|---|
| Notice type | Early market engagement (UK2) |
| Value | ÂŁ0 |
| Deadline | Not stated |
| Clarification deadline | Not stated |
| Procedure | Not stated |
| Category | Works |
| Region | UK-wide, South East |
| Contract period | 12 Sept 2029 to 31 Mar 2059 |
| Suitable for SMEs | Not stated |
| Legal regime | Procurement Act 2023 |
| Published | 6 Oct 2026 |
Description (as published)
The Hampshire Water Transfer and Water Recycling Project (The Project) is a Strategic Resource Option (SRO) and a major part of Southern Waterâs long-term strategy to address the significant water supply shortfall in Hampshire. By using advanced water treatment technologies, the Project will transform treated wastewater, normally pumped far out to sea, into purified recycled water. This new resource will supplement natural spring water from Portsmouth Waterâs Bedhampton Springs, with both sources being stored in the new Havant Thicket Reservoir. This integrated approach will maximise the reservoirâs capacity, ensuring greater water availability, especially during periods of drought. Water from the reservoir will be transferred to our existing Otterbourne Water Supply Works, where it will undergo further treatment to strict drinking water standards prior to going into supply. By establishing a sustainable and resilient water source, the Project will help safeguard essential water supplies for our customers while reducing reliance on environmentally sensitive water sources.
The Project consists of a Water Recycling Plant, tunnel and pipeline connections, a High Lift Pumping Station, and a circa 42 km transfer to Otterbourne Water Supply Works inclusive of intermediate pumping stations and break pressure tanks. The Project scope includes Design, Build, Finance, Maintain and Operate (DBFOM) of new water infrastructure, including water recycling, water transfer, and substantial tunnelling works. The Project will be procured using Ofwatâs Direct Procurement for Customers (DPC) model, with a Competitively Appointed Provider (CAP) to deliver the DBFOM project. Under the DPC model, Southern Water plan to openly tender for a CAP. Southern Water has carried out several market engagement exercises to support this procurement. Southern Water does not guarantee that all activities referenced by the CPV codes will form part of any future tender notice(s), nor is the list exhaustive of all activities which may be included in any procurement process under this Project.
CPV codes
- 43614000 Parts of tunnelling machinery
- 44000000 Construction structures and materials; auxiliary products to construction (except electric apparatus)
- 45200000 Works for complete or part construction and civil engineering work
- 45221240 Construction work for tunnels
- 45222100 Waste-treatment plant construction work
- 45231100 General construction work for pipelines
- 45231300 Construction work for water and sewage pipelines
- 45240000 Construction work for water projects
- 45252126 Drinking-water treatment plant construction work
- 50000000 Repair and maintenance services
- 65100000 Water distribution and related services
- 65130000 Operation of water supplies
- 66100000 Banking and investment services
- 66122000 Corporate finance and venture capital services
- 71000000 Architectural, construction, engineering and inspection services
- 71340000 Integrated engineering services
- 71500000 Construction-related services
- 71540000 Construction management services
- 71541000 Construction project management services
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.