Contract details (awarded)
Design and construction of a new metal footbridge, suitable for foot and cycle traffic (2)
Tewkesbury Borough Council
Key facts
| Buyer | Tewkesbury Borough Council |
|---|---|
| Notice type | Contract details (awarded) (UK7) |
| Value | Not stated |
| Deadline | Not stated |
| Clarification deadline | Not stated |
| Procedure | Below threshold - open competition |
| Category | Not stated |
| Region | South West |
| Contract period | 29 Sept 2026 to 2 Jul 2027 |
| Suitable for SMEs | Not stated |
| Legal regime | Procurement Act 2023 |
| Published | 8 Oct 2026 |
Description (as published)
The Employer requires:
• Dismantling and safe off-site disposal of the existing footbridge
• Design and construction of a new metal footbridge, suitable for foot and cycle traffic
• Installation of a temporary bridge to maintain uninterrupted access during works
• Compliance with details set out in Preliminaries, Pricing Schedule, Health & Safety Plan, Site Plan, Structural Report.
Who won
- Beaver Bridges Limited (SME)
Awarded value: Not stated
CPV codes
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.