Contract details (awarded)
CAS-01336-R8D9H5 - GARAGE BLOCK Flats 1-12 Gablehurst, Upton, Poole, BH16 5JA - Roofline Renewal
Aster Group Limited
Key facts
| Buyer | Aster Group Limited |
|---|---|
| Notice type | Contract details (awarded) (UK7) |
| Value | Not stated |
| Deadline | Not stated |
| Clarification deadline | Not stated |
| Procedure | Below threshold - limited competition |
| Category | Not stated |
| Region | South West |
| Contract period | 3 Aug 2026 to 28 Sept 2026 |
| Suitable for SMEs | Not stated |
| Legal regime | Procurement Act 2023 |
| Published | 31 Jul 2026 |
Description (as published)
Project: The refurbishment of the main hipped roof
• NB: All roofing work to be carried out by an NFRC accredited contractor & must be
able to self-certify via the competent roofing scheme.
• As part of contractor pre-survey, contractor should identity any soffit and live extractor fan vents
which will need to be disconnected and reconnected during works
• Temporarily close off working areas to exclude vehicles and pedestrians from the site using
suitable signage and remove them upon the re-opening on completion of the works.
• Provide scaffolding/staging as required to the properties to enable safe access to undertake
all works outlined within the schedule in accordance with Working at Height Regs. 2005. All
scaffolding is to be erected, managed and dismantled in accordance with guidance of NASC -
SG4 and Design should be in accordance with NASC - TG20:21.
• Allow to remove existing roof covering in accordance with current asbestos management
guidelines clearing all resultant debris from working area before starting to build and fix the
ladders, fit the deck and install new plastics as per the pricing document
Page 5 of 15
• The contractor shall review the asbestos R&D supplied and manage a
specialist asbestos removals contractor to undertake the removal and disposal of
any hazardous waste material.
• Ensure that the removal of the existing roof covering including ACM sheets and all
plastics inc guttering is compliant with current regulations.
The removals contractor must have UKATA/IATP training qualifications for any unlicensed
removals and provide consignment note upon completion of works.
• Make and supply “ladders” fitted over concrete beams to provide fall of at least 5 degrees to
the rear of the garages
• Remove the all existing, soffits, facia and guttering including any associated fixtures
and install the deck or waterproof covering with associated fixtures & fittings
• Install new fascia around the building to conceal the roof ladders as well deepflow gutter
with appropriate clips and fittings to the rear. Also supply and fit appropriate downpipe,
with appropriate clips and fittings, to the rear of the property with a minimum 2 down pipes
and all clips to be a maximum 1 metre apart