Contract details (awarded)
Air Source Heat Pump installation at Fullwell Cross Medical Centre
NHS Property Services Limited
Key facts
| Buyer | NHS Property Services Limited |
|---|---|
| Notice type | Contract details (awarded) (UK7) |
| Value | Not stated |
| Deadline | Not stated |
| Clarification deadline | Not stated |
| Procedure | Below threshold - limited competition |
| Category | Not stated |
| Region | North West |
| Contract period | 12 Oct 2026 to 15 Feb 2027 |
| Suitable for SMEs | Not stated |
| Legal regime | Procurement Act 2023 |
| Published | 14 Oct 2026 |
Description (as published)
The works involve the decarbonisation of the existing heating system by the replacement of the existing gas fired heating system with new electric air to water heat pumps and associated heating distribution system.
Who won
Awarded value: Not stated
CPV codes
Source: Find a Tender. Contains public sector information licensed under the Open Government Licence v3.0. Licence: Open Government Licence v3.0. We do not alter the facts of the notice; always check the original before bidding.