Skip to content
TenderSorted

Bid / no-bid: a 10-point checklist before you write a word

Bid only when you meet every pass/fail requirement, can evidence the scored criteria with real past work, and can price the contract at a profit. Most SMEs lose time and money by bidding for the wrong tenders. A ten-minute bid/no-bid check before you start writing stops that.

Why the decision matters more than the writing

A competent tender for a small public contract can take several days of work across writing, pricing, gathering evidence and checking. If the buyer's pass/fail rules rule you out, all of that is wasted, however good the answers are. Losing on quality is useful feedback. Losing because you never qualified is not.

The checklist below works on any UK public tender, under the Procurement Act 2023 or the old rules. Do it with the full tender pack open, not just the notice. Pass/fail items and weightings are often buried in an appendix.

The 10 checks

1. Sector fit

Is this what you actually do, day to day? "Facilities management" in a notice can mean cleaning, mechanical and electrical maintenance, security or all three. Read the specification. If more than a small part of the scope is outside your core service, you will be relying on subcontractors you may not yet have.

2. Region

Can you deliver at every site, at the frequency required, without destroying your margin on travel? Check site lists and maps. Some contracts include sites that are not yet built or may be added later.

3. Contract value against your turnover

Buyers worry about suppliers becoming too dependent on one contract. Some set a minimum turnover; many apply a rule of thumb. As a self-check, flag any contract whose annual value is above about half your annual turnover. It doesn't mean "don't bid", but expect closer financial scrutiny and think about whether you could cope with the cash flow.

4. Mandatory certificates and insurance levels

List every certificate, accreditation and insurance level the buyer requires, and check each against what you hold today and on the contract start date. Common ones are employer's liability, public liability and professional indemnity at stated limits, health and safety accreditations, quality and environmental standards, and Cyber Essentials for some digital or data work. An expired certificate counts as not held unless you can show renewal in time.

5. Financial thresholds

Look for minimum turnover, profit, net assets or ratios such as the acid-test ratio. Check them against your filed accounts, not management accounts, unless the buyer says otherwise. Note how many years they look at.

6. Similar-contract evidence

Most tenders ask for examples of similar contracts within a recent period, often with references. Count yours honestly: similar in scope, size and type of buyer, and delivered recently enough to qualify. If the tender asks for three and you have two, that is usually a fail.

7. Deadline against your capacity

Work back from the submission deadline. Allow time for the clarification deadline, pricing, internal review, sign-off and portal upload. Then look at who is going to do the writing and what else they are doing that fortnight. Also check that you could mobilise by the contract start date.

8. Incumbent and re-tender signals

Is this a re-tender? Search past award notices for the same buyer and service. A long-serving incumbent, a specification that reads like a description of one company's way of working, or a very short tender window can all be signs that the buyer is content with what it has. That doesn't make it unwinnable, but it raises the bar.

9. TUPE and risk

If staff transfer to you under TUPE, you take on their terms and conditions and some liabilities. Ask for the TUPE information early. Then read the draft contract for other risks: uncapped liabilities, service credits, unusual break clauses, payment by results, or a price that has to stay fixed for several years.

10. Profit after bid cost

Finally, price it roughly. Include labour at the rates you actually pay, consumables, travel, management time, mobilisation and the cost of writing the bid. If the realistic price leaves no margin, or only wins by undercutting yourself, walk away.

Worked example: one fit, one no-fit

To show how the checklist works, we ran two real, public tender packs from Contracts Finder against the bid library of Demo Facilities Ltd. This is a fictional company we invented for testing; its figures, clients and certificates are not real. In the fictional profile, it is a cleaning and light facilities business in Cornwall, Devon and Somerset with 38 staff and turnover of about £1.9m.

Tender A: Perranzabuloe Parish Council, public toilets cleaning

A parish council contract worth about £45,000 over three years, with a break clause and an option to extend. Published before the Procurement Act started, it uses the old Selection Questionnaire.

  • Sector and region: public convenience cleaning in Cornwall. An exact match.
  • Value: small against turnover. No concern.
  • Pass/fail: turnover above £30,000 in each of the last two years, two similar contracts in the last three years, self-certified insurance, and Modern Slavery Act and skills questions. The fictional library has three relevant case studies and the turnover clears the bar comfortably.
  • Gaps and risks flagged: a price breakdown is required but no pricing template is supplied; one of the optional sites is not yet built; and one of the fictional company's health and safety certificates has expired, so it should be renewed or explained before submission.
  • Decision: bid.

[Screenshot: TenderSorted fit score for the Perranzabuloe pack, showing a high score, the reasons and the gaps list]

Tender B: GreenSquareAccord, external audit services

A housing association's external audit contract worth about £1.0m including extensions.

  • Sector: financial audit. The fictional company's own profile says it does not provide audit services. That alone ends it.
  • Value: about half of annual turnover. Flag.
  • Pass/fail: three similar contracts in three years (none held); employer's liability £10m (held), public liability £10m (only £5m held), professional indemnity £5m (not held). The financial ratios would pass, but that doesn't matter.
  • Other signals: word-limited method statements and an interview stage, and the pricing model referred to in the documents was not attached to the public notice.
  • Decision: no bid. The fit score lists each gap as "no evidence in your library" rather than guessing.

[Screenshot: TenderSorted fit score for the GreenSquareAccord pack, showing a low score and the "no evidence in your library" gaps]

The two decisions took minutes each. Tender B would have cost days and could never have won.

Printable checklist

Copy this into your bid folder and fill it in for every tender you consider.

# Check Question to answer Deal-breaker? Your answer
1 Sector fit Is the whole scope something we already deliver? Often
2 Region Can we cover every site at the required frequency profitably? Sometimes
3 Value vs turnover Is the annual value above about 50% of our turnover? Flag, not automatic
4 Certificates and insurance Do we hold every required certificate and insurance level, in date? Yes
5 Financial thresholds Do our filed accounts meet every turnover, profit and ratio test? Yes
6 Similar contracts Do we have enough recent, similar contracts with references? Usually
7 Deadline and capacity Can we write, price and sign off in time, and mobilise by the start date? Sometimes
8 Incumbent signals Is there a strong incumbent or a spec written around one supplier? Judgement
9 TUPE and risk Do we understand TUPE costs and the contract's liabilities? Sometimes
10 Profit after bid cost Is there a real margin after delivery and bid costs? Yes

Rule: any "no" on a deal-breaker means no bid, unless you can fix it before the deadline or the buyer confirms an alternative in writing through a clarification.

Making it a habit

  • Keep your certificates, insurance schedule, accounts and case studies in one place, with expiry dates. Checks 4 to 6 then take minutes.
  • Record every decision and the reason. After a few months you will see which kinds of tender you win and which you should stop opening.
  • When you do bid and lose, read the assessment summary and note which check you got wrong, if any.

Frequently asked questions

Should I bid just to get known by the buyer?

Rarely. A weak bid is remembered for the wrong reasons and costs you days you could spend on a tender you can win. Better ways to get known are responding to preliminary market engagement, attending supplier events and asking for the assessment summary when you do bid.

What if I meet 9 of the 10 checks?

It depends which one you miss. If it is a pass/fail item (a certificate, an insurance level, a turnover minimum), you can't win, so don't bid unless you can fix it before the deadline or a clarification confirms an alternative is acceptable. If it is a softer check, such as tight capacity or a strong incumbent, it is a judgement call. Decide deliberately and write down why.

How long should a bid/no-bid decision take?

For a small contract, 15 to 30 minutes with the full tender pack open is usually enough. The aim is to find a deal-breaker quickly, not to plan the whole bid.

Sources

Last reviewed: 2026-10-26